Sand Blasting

Abrasive blasting for surface preparation and uniform matte finishes on aluminum and stainless components. Media is selected to the substrate, and blasting can be sequenced in-house with anodizing or conversion coating.

Operator abrasive-blasting an aluminum casting inside a blasting cabinet
View All Services

Process Detail

Sand Blasting at West-Tech

West-Tech provides sand blasting and abrasive blasting for components that require surface preparation, cleaning, or a controlled uniform appearance before finishing or final use. The process can remove oxidation, surface residue, and visible machining inconsistencies while creating a consistent surface texture across the part. Blast media is selected to suit the material, application, and finishing process that follows.

Blast media is selected to match the material, part condition, and required finish, allowing us to control the surface preparation rather than applying the same blasting process to every job. This helps create a more uniform appearance and a consistent starting surface for anodizing, chemical conversion coating, or final use. For customers combining blasting with another West-Tech finishing process, the entire sequence can be coordinated in-house to reduce handling, improve consistency, and simplify production.

Standard lead time is typically 4 to 5 business days, with expedited service available when production schedules require faster turnaround. Combining blasting with West-Tech's anodizing and chemical conversion capabilities can also reduce supplier handoffs and simplify the route from surface preparation through final finishing.

For an accurate quote, include the material, part dimensions, quantity, required blast media or finish expectations, applicable specification, and any finishing process that will follow blasting with your RFQ.

Technical Summary

PurposeSurface preparation and cosmetic finishing
MediaSelected to suit material and finish requirements
Surface ResultClean, uniform finish
Typical UseBefore finishing or final use
Standard Lead Time4–5 business days
Expedited ServiceAvailable on request
Production RangePrototype to full production

Discuss Your Finishing Requirement

Send your drawing and specification and we will review your requirements.